聯(lián)系我們
濟南富強門業(yè)有限公司
聯(lián)系人:林經(jīng)理
電話:151 6888 2846
郵箱:527800164@qq.com
地址:濟南市歷下區(qū)化纖廠路8號3號樓101號
生產(chǎn)濟南卷簾門要把控好質(zhì)量
來源:http://ifxf.cn 日期:2021-07-01 發(fā)布人:
質(zhì)量對于所有的行業(yè)的產(chǎn)品來說都是非常重要的,這不僅關(guān)系到產(chǎn)品的使用壽命、使用質(zhì)量,也關(guān)系到產(chǎn)品的銷售,還有產(chǎn)品企業(yè)的聲譽名氣等等,所以在生產(chǎn)產(chǎn)品的時候要把控好質(zhì)量問題。那么像卷簾門這樣的產(chǎn)品在生產(chǎn)的時候質(zhì)量要怎么樣控制好呢?下面我們來聽聽富強對卷簾門生產(chǎn)質(zhì)量控制的六個步驟,希望對大家會有所幫助!
Quality is very important for the products of all industries. It is not only related to the service life and quality of products, but also related to the sales of products, as well as the reputation and reputation of product enterprises. Therefore, we should control the quality problems in the production of products. So how to control the quality of products like rolling shutter in production? Now let's listen to the six steps of Fuqiang's quality control of rolling shutter door production, hoping to help you!
濟南卷簾門
Jinan rolling shutter door
1.卷簾門生產(chǎn)前過程控制:
1. Process control before rolling door production:
針對于卷簾門生產(chǎn)的全過程,包括了技術(shù)洽談,技術(shù)確認,技術(shù)輸出,采購驗證,生產(chǎn)加工,過程檢驗,安裝報驗等過程,通過過程控制,以保證產(chǎn)品和服務(wù)質(zhì)量。
Aiming at the whole process of rolling door production, including technical negotiation, technical confirmation, technical output, procurement verification, production and processing, process inspection, installation and inspection, through process control, to ensure the quality of products and services.
2.檢驗和試驗:
2. Inspection and test:
為了保證產(chǎn)品卷簾門的質(zhì)量,我們需要采取正確的檢驗方法,采用適當?shù)臋z驗工具,配備合格的檢驗人員,對于原材料,工序,安裝等過程進行檢驗,為卷簾門的合格提供證據(jù)。
In order to ensure the quality of the rolling shutter door, we need to take the correct inspection methods, use appropriate inspection tools, equipped with qualified inspection personnel, for raw materials, processes, installation and other processes for inspection, to provide evidence for the rolling shutter door.
3.終檢驗和試驗:
3. Final inspection and test:
按照開得樂的產(chǎn)品生產(chǎn)要求,要進行終產(chǎn)品的檢驗,按照客戶的要求,對于產(chǎn)品的安裝后進行報驗。若是通過終的檢驗,那么就能夠為工程提供合格的產(chǎn)品。
According to the product production requirements of Caldwell, the final product should be inspected. According to the customer's requirements, the product should be inspected after installation. If it passes the final inspection, then it can provide qualified products for the project.
4.檢驗和試驗狀態(tài):
4. Inspection and test status:
在對卷簾門產(chǎn)品進行加工的時候,完成安裝的各個過程的時候要按照規(guī)定采用適當?shù)臉俗R,這樣是為了確保合格的產(chǎn)品能夠進入到下一道工序。
In the rolling door products processing, the completion of the installation of each process should be in accordance with the provisions of the appropriate identification, so as to ensure that qualified products can enter the next process.
簾門廠家在生產(chǎn)卷簾門的時候,應(yīng)該注重產(chǎn)品的質(zhì)量,要嚴格按照的標準去做,才能做出更好的、更符合人們需求的卷簾門。
Curtain door manufacturers in the production of rolling doors, should pay attention to the quality of products, in strict accordance with national standards to do, in order to make better, more in line with people's needs of rolling doors.
下一篇:濟南卷簾門漏水解決方式! 上一篇:濟南卷簾門噪聲產(chǎn)生的原因是什么?
閱讀/ Recommended reading
- 電動卷簾門的優(yōu)勢 2024-11-12
- 濟南卷簾門:卷簾門遙控器失靈怎么辦? 2024-09-02
- 濟南卷簾門廠:卷簾門卡主了怎么辦 2024-08-28
- 濟南電動卷簾門:電動卷閘門沒電了怎么開? 2024-08-28
- 濟南卷簾門:控制器的安裝技巧 2024-07-06
- 車庫門出現(xiàn)故障怎么辦? 2024-06-12
- 防火卷簾門分幾種類別? 2024-06-06
- 防火卷簾門對于企業(yè)的使用有哪些? 2024-06-09
濟南卷簾門:卷簾門遙控器失靈時試試本文的方法吧!
2024-11-16
檢查電池 : Check the battery: 檢查遙控器電池是否還有電。如果電池電量不足,更換一節(jié)新的電池即可。在更換電池時,注意電池的正負極方向,確保放入的電池...